Sunday, March 16, 2014

March 15. 2014

We were able to make our storm water connection into the existing retention pond and we're still plugging away on the grade beams.

Berm at pond

RCP going into pond

Storm water manhole forming

42" head wall poured

Pond cleaned out

Rebar at grade beams

February 28, 2014

We continue to make progress on the site utilities.  We've also been able to get the building's grade beams dug and started pouring at the end of the month.

 Electric sleeves
 RCP completed at tie in
 Mud sill being placed
 East site manhole poured
 Digging grade beams
 Plumbing sleeve
 Grade beams dug
Hairpins and bolts being installed