January 31, 2014
The site has been cleared and rough graded and we're currently working on getting the site utility lines installed. The building pad has been graded out and we're getting ready for pier and grade beams.
Building corners laid out
Grubbing the pad site
Angle thrust block
Building fire line valve
Water line
Pier layout flags
RCP and HDPE on site
Water line tie in to existing