Site paving is installed along with fire lane painting required by the City. The concrete crews are working on mechanical pads and our site contractor is working on final grading. Framing will be starting this week.
Monday, June 2, 2014
Monday, May 19, 2014
May 15, 2014
We have had a few rain days, but the pictures below show the progress we are making on the fire lane and associated paving for the parking. Once the fire lane is complete we will be able to start framing.
Thickened concrete for dumpster pad
Roof drain system
Friday, May 2, 2014
May 1, 2014
The building pad has been poured and the lime stabilization for the fire lane is complete. We have gas, water, and electricity to the building. Our concrete guys started working on forming up the site paving on the south side of the project. Paving will take a few weeks and then we'll be ready to start framing.
Thursday, May 1, 2014
April 17, 2014
Our underslab utilities are in and we were able to pour the building slab. We started working on the fire lane which we need to complete before we start framing.
Tuesday, April 1, 2014
March 31, 2014
Our final grade beam pour was this past week. The utility contractor passed their water test and are in the process of raising the fire hydrants. The plumbing and electrical contractors finished their underslab utilities. Planks will be ready to start pouring next week. Final grading of the site paving areas is underway and we'll begin paving later this month.
South grade beams poured. North side being formed.
Final grade beam pour
UFER clamp installed
Underslab floor drains installed
Gas line being installed
SW manhole was demoed and getting ready to repour
Sunday, March 16, 2014
March 15. 2014
We were able to make our storm water connection into the existing retention pond and we're still plugging away on the grade beams.
Berm at pond
RCP going into pond
Storm water manhole forming
42" head wall poured
Pond cleaned out
Rebar at grade beams
February 28, 2014
We continue to make progress on the site utilities. We've also been able to get the building's grade beams dug and started pouring at the end of the month.
Electric sleeves
RCP completed at tie in
Mud sill being placed
East site manhole poured
Digging grade beams
Plumbing sleeve
Grade beams dug
Hairpins and bolts being installed